East stand now looks like a stand.
Several sections of precast terracing in place on the steel structure.
Most of the section from pitch level to the entrances has been reinforced and concreted so that the formwork can be installed for the wet pour in-situ terracing.
Third white section of steel roof support in place.
The small blob on top of the hoarding behind the small blue sign on today's 9.15 web cam shot is me!
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment